doi:10.4203/ijrt.6.3
click on a paper title to read the abstract or purchase the full-text paper (price £25)
Preliminaries | |
Extending Emergency Repair Response Times for Railway Track Switches through Multi-Channel Redundancy of Functional Subsystems, S.D. Bemment, T.J. Harrison, R.M. Goodall, C.P. Ward and R. Dixon |
1-19 |
Vehicle-Track-Soil Interaction of Isolated, Un-isolated and Damaged Railway Tracks, L. Auersch |
21-49 |
A Numerical Study on Pantograph Raising
and Lowering in Multi-Pantograph Operation, Z.D Liu, S. Stichel and A. Rønnquist |
51-69 |
Operational Displacement Estimations of
Railway Catenary Systems by
Photogrammetry and the Integration of
Acceleration Time Series, G.T. Frøseth, P. Nåvik and A. Rønnquist |
71-92 |
return to IJRT
purchase this issue (price £80 +P&P)