Computational & Technology Resources
an online resource for computational,
engineering & technology publications |
|
Civil-Comp Proceedings
ISSN 1759-3433 CCP: 110
PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON RAILWAY TECHNOLOGY: RESEARCH, DEVELOPMENT AND MAINTENANCE Edited by: J. Pombo
Paper 225
Reinstallation of Tramways across a 100 Year Portal Frame Bridge P. Van Bogaert
Civil Engineering Department, Ghent University, Belgium P. Van Bogaert, "Reinstallation of Tramways across a 100 Year Portal Frame Bridge", in J. Pombo, (Editor), "Proceedings of the Third International Conference on Railway Technology: Research, Development and Maintenance", Civil-Comp Press, Stirlingshire, UK, Paper 225, 2016. doi:10.4203/ccp.110.225
Keywords: historic bridges, numerical modelling, tramway alignment, corrosion.
Summary
The reconstruction of a particular tramway line in Ghent is related to the crossing of the River Lys by the historic St George Bridge, because it has a sharp vertical curve. Various alignments for the tracks are being considered and the load carrying capacity of the bridge is being assessed by using a numerical model, including the corrosion damage to the steel structure. Some unusual characteristics of the structure are found and only minor refurbishment will be needed for the structure to be fully functioning.
purchase the full-text of this paper (price £22)
go to the previous paper |
|