Computational & Technology Resources
an online resource for computational,
engineering & technology publications
Civil-Comp Proceedings
ISSN 1759-3433
CCP: 104
PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON RAILWAY TECHNOLOGY: RESEARCH, DEVELOPMENT AND MAINTENANCE
Edited by: J. Pombo
Paper 298

Distribution Time for Empty Lots of GDE Wagons for Loading Iron Ore

A.L.M. Barros1, M.M.C. Cruz2 and L. Fernandes2

1Vale Company, Espirito Santo, Brazil
2Federal University of Espirito Santo, Brazil

Full Bibliographic Reference for this paper
A.L.M. Barros, M.M.C. Cruz, L. Fernandes, "Distribution Time for Empty Lots of GDE Wagons for Loading Iron Ore", in J. Pombo, (Editor), "Proceedings of the Second International Conference on Railway Technology: Research, Development and Maintenance", Civil-Comp Press, Stirlingshire, UK, Paper 298, 2014. doi:10.4203/ccp.104.298
Keywords: operational scheduling, empty wagons, iron ore.

Summary
Vitória Minas Railway (EFVM - Portuguese stands) is one of the most productive Brazilian railroads and is operated by Vale Company. With a length of 905 km, it takes 40% of the whole Brazilian railroad load, and 80% of it is iron ore. In order to achieve a high carrying capacity track, it is extremely important that efficient load programming ought to be elaborated. In this context, it is essential for a tool that helps programmer teams make decisions. This paper presents a programming model which is based on network modeling, and can schedule vacant GDE wagons for iron ore loading. The objective of this work is to present a model that optimizes the hourly scheduling of 84 empty GDE wagons lots considering a daily demand load, in order to reduce the costs associated with this activity, with the use of a computer application associated with a set of operational guidelines. As a result, the model shows for each point of arrival: the initial and final load portion, and queue time. The model was tested for 53 daily batches with 3 points of loading, 4 points of transshipment and 11 points of loading. Therefore, the total elapsed time by the model for 53 batches was 4.8 hours. The result found is lower than the one reported on the railroad operations.

purchase the full-text of this paper (price £20)

go to the previous paper
go to the next paper
return to the table of contents
return to the book description
purchase this book (price £65 +P&P)