Computational & Technology Resources
an online resource for computational,
engineering & technology publications
Civil-Comp Proceedings
ISSN 1759-3433
CCP: 4/5
PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON CIVIL AND STRUCTURAL ENGINEERING COMPUTING
Edited by: B.H.V. Topping
Paper II.2

An Integrated Approach to Billing and Estimating using CESMM2

D. Kitley

Aramis Computing Services Ltd., Camborne, Cornwall, England

Full Bibliographic Reference for this paper
D. Kitley, "An Integrated Approach to Billing and Estimating using CESMM2", in B.H.V. Topping, (Editor), "Proceedings of the Third International Conference on Civil and Structural Engineering Computing", Civil-Comp Press, Edinburgh, UK, pp 25-33, 1987. doi:10.4203/ccp.4.2.2
Abstract
This Paper considers an integrated approach to the procedure for:
  1. Preparing Bills of Quantities by the design engineer.
  2. Preparing estimates by the design engineer.
  3. Preparing tenders by the contractor.
  4. Producing management control information for the contractor.
  5. Measuring work completed and producing interim valuation certificates.
The example is based on proprietary software called Micro-RATE, and specifically the Civil Engineers Standard Method of Measurement Second Edition (CESMM2) which is widely used for Civil Engineering projects.

purchase the full-text of this paper (price £20)

go to the previous paper
go to the next paper
return to the table of contents
return to the book description
purchase this book (price £78 +P&P)