Your query returned 5 results.
- A Hybrid Method for the Resource-Constrained Project Scheduling Problem with Hammock Activities,
O. Eliezer and R. Levi
Paper 23.160 from CCP: 102, ISBN 978-1-905088-57-7 (2013)
- An Improved Hybrid Algorithm for the Resource-Constrained Project Scheduling Problem with Hammock Activities,
O. Eliezer and R. Levi
Paper 20 from CCP: 97, ISBN 978-1-905088-50-8 (2011)
- A New Dispersal-Based Resource Constrained Total Project Float Measure,
R. Levi
Paper 86 from CCP: 94, ISBN 978-1-905088-41-6 (2010)
- A Hybrid Method for the Resource-Constrained Project Scheduling Problem with Hammock Activities and Strip Packing like Resource Constraints,
O. Eliezer and R. Levi
Paper 91 from CCP: 94, ISBN 978-1-905088-41-6 (2010)
- A Hybrid Metaheuristic for a Bi-Objective Resource-Constrained Project Scheduling Problem,
R. Levi
Paper 4 from CCP: 92, ISBN 978-1-905088-35-5 (2009)