- An Improved Hybrid Method for the Multi-Mode Resource-Constrained Project Scheduling Problem,
A. Csébfalvi and E. Szendroi
Paper 7.50 from CCP: 100, ISBN 978-1-905088-55-3 (2012)
- A Hybrid Method for the Multi-Mode Resource-Constrained Project Scheduling Problem with Strip Packing like Resource Constraints,
E. Szendroi
Paper 93 from CCP: 94, ISBN 978-1-905088-41-6 (2010)
- A Hybrid Method for the Multi-Mode Resource-Constrained Project Scheduling Problem,
E. Szendroi
Paper 3 from CCP: 92, ISBN 978-1-905088-35-5 (2009)